Skip to content
YDOĞA YARGICI

BIM for architecturepractices and contractors.

Architect. Running BIM on residential, mixed-use, hospitality and public projects since 2017. For architecture practices: template and standards setup, team training, model checking. For contractors: quantities and room schedules from the model. The work is carried out end to end by one person.

  • 01BIM setup and standards
  • 02Training
  • 03Project-based modelling
  • 04Quantities and room schedules
  • 05Revit add-in development
01

Services

01

BIM setup and standards

Project templates, family libraries, naming and parameter structure. Shared parameter sets and ISO 19650 family organisation are put in place.

You receiveTemplate file, family library, parameter list, BEP

Template · BEP
02

Training

Run on a live project of your own, never on a prepared sample file. What you keep afterwards is a project that moved forward, not a training exercise.

You receiveSession recording, short guide, the project itself

In-house
03

Project-based modelling

Architectural model production and DWG to Revit conversion. Includes model checking: unenclosed rooms, elements missing from schedules.

You receiveRevit model, check report, drawing sheets

Model · Checking
04

Quantities and room schedules

Formwork areas, floor and wall quantities are computed from the model. Room schedules and tables export to Excel.

You receiveExcel take-off, room schedule, formwork report

Take-off · Excel
05

Revit add-in development

Dimensioning, room numbering, schedule export and similar manual routines collapse into one command. Written in C# on the Revit API.

You receiveInstaller, source code, usage notes

C# · Revit API
02

How the work runs

  1. 01

    Conversation

    Which task is still done by hand, and whose time it eats.

  2. 02

    Review

    A live project file, template and family library are examined. Findings come in writing.

  3. 03

    Build

    Depending on scope: a template is set up, a model is produced, training is run, or an add-in is written.

  4. 04

    Handover

    Templates, models, source code and usage notes, as the work requires; all handed over in writing.

03

Experience

These are not this office's projects. They are a selection of work done as an architect and BIM lead while employed at other architecture practices.

2025Hoşdere HousingResidential
2023Lens CaddeMixed use
2023Nesta CuisineCommercial interior
2022Excap CappadociaAdventure park
2021Manzara VadiResidential
2020Söğütlüçeşme Transit HubTransport
2019Chimgan Ski Hotel, UzbekistanHospitality
2018Ataşehir ModernMixed use
2017Gebze Technical University InstituteEducation
2017Maltepe T TowersOffice
04

Tools in use

BIM Butler

Revit tools I built and use on consulting work. Not a product for sale; part of the work itself. What they do:

01

The context model is built from the map.

Topography, surrounding buildings and roads are modelled for the selected parcel. Parcel geometry comes from the cadastral service; setback lines are set.

02

CAD drawings move into Revit.

DWG is read; layers are mapped and built as walls, doors, windows and columns.

03

The model is checked before delivery.

Unenclosed rooms, elements missing from schedules and room compliance are checked. Findings come in writing.

04

Quantities are taken from the model.

Formwork areas, automatic dimensioning and schedule export to Excel.

05

About

Doğa Yargıcı

Architect, BIM lead

B.Arch, Doğuş University (Erasmus, Politecnico di Bari) · MSc Construction Project Management, İTÜ

An architect who has run BIM at various architecture practices since 2017, across residential, mixed-use, hospitality and public-scale projects. The BIM side of a project, from template and standards setup through to model checking, is handled end to end by one person. The Revit tools used day to day are self-built, to cut down repetitive work.

06

Contact

Get in touch about a project.

Replies within two working days.

What you send is used only to get back to you. Privacy notice